Sperian Protection
Home
About Survivair
Products
Home
Training Classes
Safety Notices
News
Contact
Support
Survivair Store
   Submit
 
   

Click on a tech bulletin below to view PDF. Requires Adobe Acrobat™ Reader. Download Free Copy of the Adobe Acrobat™ Reader here.

NO. SUBJECT DATE ISSUED
Hexavalent Chromium (CrVI) Standard 3/1/07
131 Survivair Repair and Maintenance Class Update 3/14/06
130 Update of Technical Bulletins 3/7/06
129 Torque Specifications for SCBA Cylinder and Valve Assemblies, Installation Instructions 3/7/06
128 Torque Specifications for SCBA Cylinders and Valve Assemblies 3/7/06
127 Discontinuation of the Use of Never-Seez® on Survivair® Cylinder Valve Threads 12/20/05
126 Batteries for SCBA & SAR Products 12/19/05
125 Cylinder Filling Procedure 4/29/05
124 Respirator Overhall Requirements 4/29/05
123 905700 Portable Test Console (PTC) 7/6/04
122 Panther and Cougar Second Stage Regulator Outlet 1/13/03
119 Panther Whistle Alarm Sound Level Test 4/29/02
119 Sound Level Test Procedure Instructions 4/29/02
118 XL Series of SCBA 1/7/02
117 Trigger Pin Lubricant 12/17/01
116 First Stage Cap Screw Loctite & Torque Procedure-- 12/17/01
115 ADAM Repair Cost and Gauge Line Torque Procedure 7/27/01
114 TwentyTwenty RCS/Small Talk Plus Pin Replacement Kit 7/27/01
114 Installation Instructions for 114 7/27/01
113 Procedure for Changing from Non-Locking Cylinder Valve... 1/9/01
112 XL-30 Regulators 12/21/00
111 Adam Function Buttons & Gauge Line Torque Procedure 12/21/00
109 Improper SmallTalk Battery Installation 10/11/00
108 Luxfer Technical Bulletin Entitled ''Inspection and Replacement...'' 9/11/00
107 SmallTalk Voice Projection Unit for TwentyTwenty 7/20/00
105 Panther SCBA Serial Numbers 6/19/00
104 Marking of Life Support Product Components 6/19/00
103 Cylinder Filling Procedure 6/19/00
102 Lubricants, Cleaners, and Adhesives 6/19/00
101 TwentyTwenty style Facepiece Headnet Installation 12/3/97
100 SmallTalk Voice Projection Unit, Speaker Grill Re-attachment 7/15/97
98 Storage Procedures for Survivair SCBA 6/15/96
95 Cold Weather Operation SIGMA, OMEGA, SECOBA, LO-PRO... 6/28/95
94 Clamp Replacement, EBA-5/10/HF5 6/23/95
92 Replacement of O-Rings in SIGMA SCBA 5/16/95
91 Cylinder Valve Latch Assembly 10/10/94
88 SCBA Cold Weather ''Freeze-Up'' 8/27/93
87 Change to Maximum Operating Pressures for Constant Flow... 8/24/93
85 Salvage-Master Wet Vacuum 6/11/93
82 Luxfer Technical Bulletin Entitled ''Composite Cylinder Safety...'' 5/12/93
78 Dip Tube (P/N 921021) Reinstallation Procedure 2/12/93
67 Identifying SCBA Approvals 9/15/92
73 Mark 2 Over the Shoulder (OTS) Gauge Hose 8/25/92
68 Mark 2 SCBA/SAR Second Stage Regulator Parts 7/26/92
65 SCBA Used in Excessive Heat or Flashover 2/3/92
56 SCBA Cold Weather Maintenance 8/13/91
62 Christo-lube 5/16/91
60 Low Pressure Hose Clamps on SCBA Units 12/5/90
58 Low Pressure Hose Clamps on SCBA Units 4/24/90
57 Survivair SCBA Quick Connects 4/20/90
40 ''Sticky'' Exhalation Valve on the the Mark 2 Mask 6/7/88
38 Mark 2 Gauge Line 3/1/88
47 Improved Mark 2 Alarm Performance 2/27/86
48 Inspection of Mark 2 L.P. Hose Quick Disconnect on All Models 2/27/86
49 Corrosion Control of Alarm Assemblies Used on XL/MK1/SAR 2/27/86
46 Improved Facepiece Mounted Regulator 2/27/86
26 Mandatory Retrofit of 910150 Cap & Chain Accessory for MK2 10/18/85
4 Facepiece Cleaning Procedure 4/1/83